Production Scale
- Facility Area 3,518 m²
- Production Lines 8 Dedicated Lines
- Machinery Units 95+ Modern Units
- Total Staff 43 Specialists
Audited performance benchmarks based on continuous export shipments, delivery rates, and third-party inspection data.
Buyer Satisfaction Rating
4.5% higher than the industry benchmark
Audited by Intertek Comprehensive engineering and manufacturing capabilities housed within our specialized 3,518 m² manufacturing facility in Ningbo.
Zhejiang ZIRA Membrane Switch Co., Ltd. supplies industrial, medical, and telecom interfaces worldwide, supported by rapid shipping from Ningbo and Shanghai sea and air ports.
Our management systems and manufacturing processes undergo stringent audits to ensure compliance with global procurement requirements.
Certified scope covers film switch and film panel production, verifying robust process controls, raw material traceability, and continuous quality audits.
The supplier premises, legal registration, production lines, and QA capabilities have been verified on-site by Intertek. Buyers can request full third-party inspection documentation directly through our sales team.
Every membrane switch and silicone keypad is produced in strict compliance with ISO 9001 standards through 10 precision stages.

Incoming PET, Autotype film, 3M adhesives, and conductive inks are tested.

Layer stack-up, pin-outs, and tolerances validated with buyer drawings.

High-mesh precision stencil preparation for fine-pitch silver traces.

Color overlay and conductive circuit traces screen-printed in clean zones.

Controlled baking profiles guarantee stable conductivity and adhesion.

Optical registration holes ensure precise multi-layer alignment.

Pillow, rim, or dome embossing creates durable tactile feedback.

Crimping of female/male housing connectors, solder tabs, or ZIF tails.

Multi-layer adhesive assembly with metal domes and LED integration.

Continuity, loop resistance, insulation, and tactile force validation.
Send your 2D/3D CAD drawings or project specifications. Our engineering team responds within 24 hours with a DFM report, tooling estimates, and sampling lead times.